Assessing stains on coated chimney flashings

A dark mark on a chimney flashing does not yet tell you what is happening to the sheet metal. It may be a deposit, soiling left after works, or a sign of surface damage. Before cleaning, it is worth identifying the source of the change. Chimney flashings work in a complex environment, so an arbitrary chemical agent is often a poor choice. The assessment must be combined with checking the joints and the path of water around the roof penetration. Check where the soiling appears and whether it recurs after cleaning. Its location can help distinguish run-off from the chimney surface from contamination left on the roof. However, final conclusions should not be drawn from the colour of the stain alone. An inspection of the location is needed.

By |2026-11-15T03:03:36+01:002023-01-19|Building guide|Comments Off on Assessing stains on coated chimney flashings

Choosing a new covering after an asbestos cement roof is removed

First establish whether the old sheets contain asbestos and plan their safe removal — only then choose the covering. The key variable is the condition of the roof structure, not just the weight or price of the new material. Check rafters, purlins, wall plates and connections, especially near chimneys and former leaks; do not judge the load-bearing capacity of the timber from a photograph. The colloquial term “eternit” is used for various sheets, so determine the covering’s composition from documentation and expert assessment. Before setting a date, ask your municipality about collection rules and possible support. Only after these steps should you compare trapezoidal sheet with modular metal tile.

By |2026-11-14T19:20:32+01:002023-01-11|Building guide|Comments Off on Choosing a new covering after an asbestos cement roof is removed

Reading trapezoidal sheet designations: T18, T35 and structural profiles

A profile name alone is not enough to order trapezoidal sheet – you also need to check the technical data sheet for the specific product. The designation T18 or T35 helps initially identify the family and rib height, but it is not a common description of all products on the market. Before purchase, verify thickness, cover width, coating and length, as well as the cross-section drawing. Two products with a similar name may have different rib spacing and sheet width. Do not read load capacity from the name alone – it requires tables for the given product.

By |2026-11-14T16:09:25+01:002023-01-03|Building guide|Comments Off on Reading trapezoidal sheet designations: T18, T35 and structural profiles

Condensation beneath fibre cement roofing: tracing the source of moisture

Droplets on the underside of the roof do not always mean damaged roofing. The water may come from the air inside the building. Fibre cement sheets then become the place where the moisture and temperature problem becomes visible. Asbestos-free fibre cement can temporarily buffer some moisture, but it does not guarantee a dry underside under all conditions. Identifying the cause is important, because a leak and condensation require different measures. The air contains moisture from people, animals, wet materials and ongoing work. When it meets a sufficiently cool surface, water may condense. It does not have to be raining for this to happen. In an unheated building, weather changes and cooling of the roof slope also matter.

By |2026-11-15T17:56:17+01:002022-11-25|Building guide|Comments Off on Condensation beneath fibre cement roofing: tracing the source of moisture

PIR floor insulation: specifying CS, creep and loads

The floor specification must combine thermal performance with mechanical requirements. PIR boards can help where the available height is limited, but their selection should not end with CS(10). Information is needed on the intended use, the permanent compressive stresses and the load-distributing layer. Low thermal conductivity allows an effective insulation layer to fit under the screed. The cross-section should show all levels from the substrate to the finish. This makes it possible to check whether the proposed insulation thickness fits within the assumed height. The layer schedule should separate the thickness of the insulation from the thickness of the screed and the finish. It is also worth stating the permitted substrate preparation.

By |2026-11-16T00:56:07+01:002022-11-11|Building guide|Comments Off on PIR floor insulation: specifying CS, creep and loads

Finding thermal bridges in buildings with corrugated fibre cement roofs

Even a thick layer of insulation may not provide uniform protection if heat finds an easier path through the junctions. Thermal bridges often occur in places that are not visible once the work is finished. Fibre cement sheets are the outer part of the roof and do not automatically resolve these details. Asbestos-free fibre cement must be considered together with the structure and the insulation. It is precisely at their interface that the causes of cold strips or local dampness should be sought. A cold spot may result from easier heat flow through the material, but also from air leakage. The symptoms may be similar, but the repairs are different. A structural thermal bridge will not disappear by simply taping the membrane.

By |2026-11-15T17:56:39+01:002022-09-14|Building guide|Comments Off on Finding thermal bridges in buildings with corrugated fibre cement roofs

A double row of metal fence pickets: planning depth and views through the fence

Two rows of pickets create a spatial arrangement that cannot be assessed from a flat front view alone. Offsetting the elements affects what can be seen through the gaps. A second layer of shadows and a more pronounced depth of the bay are also added. Metal fence pickets can thus screen a selected part of the property more effectively. However, this is not automatically a full wall. The design should cover the geometry of both rows, the structure and the view from several directions. Before choosing the spacing, mark the observation points. This may be the pavement by the street, the neighbouring garden or the entrance area. Also check the position of people sitting on the terrace. A two-row arrangement is worth designing for specific viewing directions. Simply adding another layer of material does not guarantee the same effect from every side.

By |2026-11-15T17:54:34+01:002022-09-10|Building guide|Comments Off on A double row of metal fence pickets: planning depth and views through the fence

Thermal movement and joints in long parapet copings

A long parapet cover changes dimensions with temperature. As it heats up, the steel expands; as it cools, it contracts. The detail should account for this process in how sections are divided and fixed. Choosing an attractive coating is not enough. The substrate, shape and connections must also be addressed. The flashing can then perform its function without unintentionally stressing the entire strip. Thermal expansion is a property of the material. With a small element the change may be slight, but over a long run it becomes more noticeable. As a guide, a steel element three metres long can change length by about 1.8 millimetres with a temperature change of fifty degrees.

By |2026-11-15T03:03:52+01:002022-08-27|Building guide|Comments Off on Thermal movement and joints in long parapet copings

Vertical metal fence pickets: using slim lines in the garden design

A vertical arrangement is the natural way to use individual fence pickets. It creates a regular rhythm and makes each element clearly legible. This does not mean there is only one possible appearance, however. Narrow pickets with a large gap produce a different effect from wide profiles set close together. Height and the shape of the top ends also matter. Metal fence pickets are therefore best assessed as a series of repetitions within a specific bay. Verticality alone guarantees neither lightness nor privacy. Two pickets of the same length can appear more slender or more massive. The width of the face and the depth of the section influence this. By way of illustration, an element 1500 mm long and 100 mm wide has a ratio of 15 to 1. At a width of 115 mm the ratio is approximately 13 to 1. This describes geometry, not a judgement of product quality.

By |2026-11-15T17:54:20+01:002022-08-19|Building guide|Comments Off on Vertical metal fence pickets: using slim lines in the garden design

Comparing PIR and XPS in a technical specification

In the specification of a PIR-for-XPS substitute, it is not enough to compare lambda and thickness. A common set of requirements for the given location is needed. PIR boards can provide a favourable thermal resistance, but equivalence also covers moisture, mechanical and installation conditions. Polyurethane foam and extruded polystyrene are different plastics. Comparing their lambda does not exhaust the description of the materials. Lower conductivity does not automatically mean better water resistance, greater load-bearing capacity or a more favourable reaction to fire. Each of these properties is assessed separately. For a thermal objective, specify the required property of the layer or of the entire building element.

By |2026-11-16T00:55:23+01:002022-07-12|Building guide|Comments Off on Comparing PIR and XPS in a technical specification
Back to top