Specifying Recticel Eurofloor: CS versus permissible loading

The value of 120 kPa in the Eurofloor data describes a specific material test result. It should not be entered directly as the permissible service load. Floor design also requires an assessment of long-term and point loads and of how they are distributed. Recticel Eurofloor has a rigid PIR foam core and a multi-layer gas-tight foil with a printed grid on both sides. The manufacturer intends it for thermal insulation of floors, including those with underfloor heating. In the application specification described as PIR boards, clearly indicate a floor with a heating installation located in the layers above the thermal insulation. Eurofloor must be placed in the correct floor cross-section together with the planned heating installation, and the adopted variant must be clearly marked in the documentation.

By |2026-11-16T00:52:26+01:002022-01-12|Building guide|Comments Off on Specifying Recticel Eurofloor: CS versus permissible loading

Vapour control layers beneath fibre cement roofing: when are they needed?

The need for a vapour control layer is not decided by the name of the covering alone. Temperature, indoor humidity and the layer build-up of the roof are more important. Fibre cement sheets can cover both an open canopy and a heated attic. In each case, water vapour behaves differently. Asbestos-free fibre cement does not replace a layer that controls its flow. The choice of such a solution must be linked to airtightness and the ability of the assembly to dry out. Simplified guidance usually refers to vapour diffusion through materials. In a real building, the flow of moist air through gaps is also significant. A leaky joint at a wall or duct can supply moisture to cool layers.

By |2026-11-15T17:56:34+01:002021-12-14|Building guide|Comments Off on Vapour control layers beneath fibre cement roofing: when are they needed?

Designing with Utherm Sarking LE Plus: edges, membrane and details

The description of Utherm Sarking LE Plus should separate the product data from the calculation of the counter-batten fixing. The large format and the edge profile do not determine the screw spacing. The project also needs membrane details so that the scope of supply matches the intended execution. Utherm Sarking LE Plus belongs to the PIR boards for pitched roofs. On both sides it has a multi-layer gas-tight laminate. The terms “polyurethane boards” and “polyurethane foam” are broader than the precise designation of the PIR product. In the description of use for PIR boards, the difference between Utherm Sarking LE and the LE Plus variant with the additional membrane must be stated unambiguously. The description of function should make it possible to establish the full name of the Sarking variant before additional membranes are selected.

By |2026-11-16T00:53:38+01:002021-11-05|Building guide|Comments Off on Designing with Utherm Sarking LE Plus: edges, membrane and details

Energy renovation across several buildings: setting priorities and comparing results

A thermal modernisation programme covering several buildings needs a common assessment method and separate solutions for each property. A school, a residential building and a commercial unit differ in operating hours, the condition of the building envelope and how the services perform. On Izoprofil.eu we describe how to prepare the order of renovations: gathering data, identifying urgent defects, selecting the scope and checking the results once the works are complete. PIR boards can be one of the insulation materials, especially where the geometry of the existing detail limits the space available for layers. Their suitability, however, is determined by the requirements of the specific building element. A shared schedule of the investment helps compare the needs of the buildings without attributing the same savings to all of them. The reference point should be energy consumption together with a description of comfort and how the building is used.

By |2026-11-15T17:55:10+01:002021-10-07|Building guide|Comments Off on Energy renovation across several buildings: setting priorities and comparing results

Thermano Compact in construction details: dimensions, lambda and limitations

A detail should not leave the installer with nothing but the instruction “top up the PIR”. For Thermano Compact, the thickness, the edge and the connection to the surrounding construction must be specified. This ensures that the smaller board retains a specific function instead of becoming a random insert in a gap. Thermano Compact is a PIR board in the 600 × 1200 mm format, with a multi-layer facing containing aluminium. The smaller format is an important practical feature. In the application specification described as PIR boards, clearly indicate the small working area into which a 600 × 1200 mm board is easier to bring. The Thermano Compact format must be matched to the size of the working area and the available transport route, and the adopted variant must be clearly marked in the documentation.

By |2026-11-16T00:52:12+01:002021-08-11|Building guide|Comments Off on Thermano Compact in construction details: dimensions, lambda and limitations

Thermano ETICS calculations: why PIR and EPS must be distinguished

Thermano ETICS comprises two layers with different thermal properties. The lambda of PIR must not be applied to the combined thickness of PIR and EPS. The design should use the thermal resistance of the finished board or correctly separate the materials in the calculation. Thermano ETICS is a composite board consisting of PIR with an outer EPS layer 20 mm thick. The PIR part has gas-tight multilayer facings incorporating aluminium. In the specification of use described as PIR boards, clearly indicate the cross-section of the façade board with a PIR core and an outer EPS layer 20 mm thick. The surface of Thermano ETICS must be recognised as the outer EPS layer belonging to the composite, and the adopted variant must be clearly marked in the documentation.

By |2026-11-16T00:52:15+01:002021-05-23|Building guide|Comments Off on Thermano ETICS calculations: why PIR and EPS must be distinguished

IKO enertherm ALU: documenting properties and fire classifications

The requirement for ALU should distinguish between the reaction of the product itself and the result of a specific end use. A more favourable class must not be transferred without the test conditions. The specification must relate it to the actual substrate and assembly. This is particularly important when assessing proposals to substitute the material. The IKO enertherm ALU specification should identify the function that the building envelope assembly with aluminium-faced PIR boards is to perform. An element requiring an unambiguous description is the penetration of services through the continuous insulation layer. The input data should include the thickness of the layer and the position of the elements penetrating the insulation, and not only the area intended for insulation. The coordinating document remains the cross-section with the full ALU designation and the required protective layers.

By |2026-11-16T00:53:18+01:002021-05-13|Building guide|Comments Off on IKO enertherm ALU: documenting properties and fire classifications

BauderPIR T: coordinating falls and thermal performance in roof design

The BauderPIR T specification requires a geometry drawing and a schedule of tapered boards. A statement of 2% fall alone does not define the starting height, the route of the drainage channels or the position of the outlets. The thermal calculation must correspond to the actual distribution of thicknesses. The documentation should make it possible to reproduce this arrangement on site. The BauderPIR T specification should identify the function that the roof with uncoated tapered boards is to perform. One element requiring an unambiguous description is the drainage channel directing water towards the outlet. The input data should include the substrate levels and the route of the water-collecting lines, not only the area intended for thermal insulation. The coordinating document remains the falls drawing with the direction in which the thickness increases. It should be recorded who confirms the feasibility of the task: to achieve the required drainage path and a correct thermal section.

By |2026-11-16T00:53:05+01:002021-02-09|Building guide|Comments Off on BauderPIR T: coordinating falls and thermal performance in roof design

Choosing an underlay membrane for a corrugated fibre cement roof

A roof membrane is not selected solely on the basis of the type of external sheet. You need to know what it is to protect against and where any water will be drained away. Fibre cement sheets are the main covering, while the underlay can perform an additional function in a specific assembly. Asbestos-free fibre cement does not impose a single membrane for every building. The choice is determined by the structure, insulation, ventilation and the requirements in the documentation for the materials used. The membrane can help protect the layers below against water penetrating under the covering. Its scope of action results from the properties of the product and the method of installation. It is not automatically a substitute roof for any length of time.

By |2026-11-15T17:56:36+01:002021-01-10|Building guide|Comments Off on Choosing an underlay membrane for a corrugated fibre cement roof

PIR procurement specifications: defining material equivalence

An equivalent PIR board should perform all the required functions, not merely have a similar lambda value. The enquiry should describe the facing, the edges, the mechanical properties and the application. This allows the proposed substitution to be checked before delivery and installation. PIR boards can look similar yet have different facings, strength and intended use. Before purchase, a current technical data sheet, a declaration of performance and installation instructions are needed. The documentation should relate to the variant available on the given market. Parameters from the data sheet of a different version cannot fill gaps in the offer. The data sheet of a similar product may contain different dimensions, facing or classification.

By |2026-11-16T00:56:18+01:002021-01-01|Building guide|Comments Off on PIR procurement specifications: defining material equivalence