BauderPIR T: coordinating falls and thermal performance in roof design

PIR insulation

At a glance

The BauderPIR T specification requires a geometry drawing and a schedule of tapered boards. A statement of 2% fall alone does not define the starting height, the route of the drainage channels or the position of the outlets. The thermal calculation must correspond to the actual distribution of thicknesses. The documentation should make it possible to reproduce this arrangement on site. The BauderPIR T specification should identify the function that the roof with uncoated tapered boards is to perform. One element requiring an unambiguous description is the drainage channel directing water towards the outlet. The input data should include the substrate levels and the route of the water-collecting lines, not only the area intended for thermal insulation. The coordinating document remains the falls drawing with the direction in which the thickness increases. It should be recorded who confirms the feasibility of the task: to achieve the required drainage path and a correct thermal section.

Unfaced BauderPIR T tapered boards made of cream-coloured PIR with straight edges

Input data for the specification

Responsibility for this part should be assigned to the designer of the roof falls, following the agreed allocation of design work.

The correct product and the scope of its data

BauderPIR T is available as an uncoated PIR board with straight edges and a format of 1200 × 800 mm, so the product description must allow it to be distinguished from the variant with aluminium facing, designated BauderPIR FA. The Polish data sheet states slopes from 1% to 5% in increments of 0.5 percentage points; a 2% slope is one of the variants, not a default value. The specification copies the reaction to fire E and a compressive strength of at least 120 kPa, while the thermal values are read for this variant and the relevant thickness. In BauderPIR T, the polyurethane foam of the PIR type remains without factory facings, and the term installation refers to the layer build-up of the factory-made boards, not to the core material itself.

What the presented calculation covers

A calculation example clarifies the reading of the geometry: a 1.00 m section with a constant slope of 2.00% gives a height difference between the ends of approximately 20.0 mm. In the BauderPIR T family, the slope value is based on the documentation, but the example does not define a complete field or the starting height, and the level at the outlet depends additionally on the substrate and the underlying layers. Therefore, in the detailed design, the slope drawing with the direction of increasing thickness is prepared together with the detail of the drainage channel directing water towards the drain and with the actual course of all sections. The result of the example is not treated as the thermal resistance of the roof; it serves to check the execution and to reproduce the layout on site.

For BauderPIR T, the distinction between the product data and the result of the overall solution must be maintained. The analysis uses the characteristic: slope range from 1% to 5% in increments of 0.5 percentage points. The assessment must take into account the limitation: the correct assignment of each tapered board to its place in the plan. Before approving the variant, the channel line and the outlet level must be compared with the actual geometry of the substrate and the result recorded in the documentation. Reproducing the assumptions is made possible by the slope drawing with the direction of increasing thickness. This ensures that a later comparison with another offer does not omit the element described as the drainage channel directing water towards the drain.

Conditions for assessing the variant

In the project, the performance described as laying the designed tapered boards on an identified substrate can be compared with the solution of changing the slope plan once different elevations have been established. The criterion should follow from the required route for water drainage and the thermal performance of the proposed build-up. For BauderPIR T, retaining a single figure from the data sheet does not mean that the entire section is equivalent. The requirements must also take into account the plain edge of the uncoated tapered board. It must be ruled out that the nominal slope of the tapered board is taken as confirmation of drainage across the entire roof slope, because this changes the meaning of the recorded parameter. The decision should be presented by the slope layout designer, together with the scope of changes for adjacent materials. The adopted variant must be linked to the schedule: a list of tapered board types with quantities for each drainage field.

Description of the execution of the important connection

The drawing should clearly indicate the drainage channel directing water towards the outlet. In the case of BauderPIR T, the surface of the material formed by the exposed PIR surface without factory facing must also be described. The preparation must provide a substrate consistent with the geometry of the slope system. The required inspection point occurs before the stage described as the waterproofing covering in the confirmed roof solution. The basis for acceptance is the record of tapered board markings and elevation measurements before covering, assigned to the drawing and the installation location. Such a description limits discretionary decisions by the crew at a point that will not be visible later.

Delivery and acceptance documents

The delivery of BauderPIR T should be assignable to a single specification item. This item is expanded by the list of tapered board types with quantities for each drainage field; every described characteristic should have a reference to the project. A record of tapered board markings and elevation measurements before covering is needed, allowing the variant and the manner of its use to be confirmed. If conditions change, the correct assignment of each tapered board to a location in the plan must be reconsidered. The update should be agreed by the slope layout designer before the next layer conceals the discrepancy. In this way, the polyurethane insulation is linked to the executed scope, namely the roof with uncoated tapered boards.

A record that can be checked later

The final description of BauderPIR T should make it possible to reproduce the adopted decision without guessing its purpose. In this case, the purpose can be defined as providing the intended drainage route while maintaining a properly designed thermal build-up. The description should be accompanied by the slope drawing with the direction in which the thickness increases. The drainage channel directing water towards the outlet should be indicated separately where its design differs from the main field. The record should cover the entire required scope. When proposing a substitute, the channel line and the outlet level must be compared again with the actual substrate geometry, instead of basing the assessment solely on the name PIR. Polyurethane boards are then compared according to verifiable characteristics and their effects on the specific section.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote