About PiVi

This author has not yet filled in any details.
So far PiVi has created 1503 blog entries.

Continuous, airtight insulation for a loft conversion

A continuous thermal layer and moisture control matter more than merely filling the space between rafters. Before choosing an assembly, check the condition of the covering, the timber and the layers beneath the metal sheet, and mark out the insulation route across the slopes, ceiling and walls. PIR boards reduce thickness but must belong to the correct assembly, and every detail and joint needs checking. Also consider the available height and ventilation, as these factors determine the choice of material and the sequence of layers.

By |2026-11-15T03:02:18+01:002023-08-13|Building guide|Comments Off on Continuous, airtight insulation for a loft conversion

Roof pitch, water run-off and the choice of covering

The choice of roofing is determined not only by the roof pitch but also by how water drains and how sheets are joined. Before buying, check the permissible slope for the specific product and roof layout, and distinguish degrees from percentages. Pay attention to lap lengths, sealing and drainage, especially on shallower slopes. Remember that the material name alone does not guarantee the performance of the whole system — installation instructions and execution details are key.

By |2026-11-15T03:00:29+01:002023-08-05|Building guide|Comments Off on Roof pitch, water run-off and the choice of covering

Specifying SOPREMA EFYOS BLUE A: properties, edges and applications

The BLUE A design specification gives only the name and thickness. The edge variant and a reference to the parapet detail are missing. The specification should allow the delivery to be checked without having to guess the author's intention. Otherwise, two different boards may be treated as the same procurement item. The EFYOS BLUE A specification should identify the function that the thermal insulation of the flat roof beneath the waterproofing is to perform. The termination of the thermal insulation at the parapet is an element requiring an unambiguous description. The input data should include the height of the parapet above the target covering surface, not only the area intended for thermal insulation. The parapet section with the levels of all layers remains the coordinating document.

By |2026-11-16T00:52:42+01:002023-07-27|Building guide|Comments Off on Specifying SOPREMA EFYOS BLUE A: properties, edges and applications

When does a roof need ventilation tiles and where do they go?

A ventilation tile is needed wherever the design calls for assisted air exchange beneath the covering, particularly around a chimney or roof window. The building owner and the trade should first establish where air enters at the eaves and is meant to leave the slope, then check whether obstacles block that flow. The number and arrangement of elements are determined for the whole detail, not copied from a neighbouring property. With metal roofing, accessories matched to the sheet profile are used rather than ceramic or concrete tiles.

By |2026-11-14T22:53:46+01:002023-07-24|Building guide|Comments Off on When does a roof need ventilation tiles and where do they go?

When do 40 mm second-grade roof panels offer a saving?

A 40 mm second-grade insulated roof panel can be economical only if it meets the project requirements and has a known condition. Check the core, sheets, profile, locks and batch documents, and confirm the load capacity for the actual support spacing and the slope conditions. A thickness of 40 mm alone does not guarantee insulation performance or universal application. Add waste, repairs and installation to the price; the saving disappears when the covering has to be rebuilt.

By |2026-11-14T16:06:16+01:002023-07-14|Building guide|Comments Off on When do 40 mm second-grade roof panels offer a saving?

Concealed gutters: where they fit and what they require

A concealed gutter makes sense above all where you want to reduce the visibility of drainage elements in the building's form. It is worth checking in advance how the water path will run, where access for inspection is planned, and what will happen if the outlet becomes blocked. The decision is best taken at design stage, before the roof and wall layers are built. Concealing the gutter alone does not change the amount of water flowing off, and shape and enclosure are separate matters. The final choice rests with the designer.

By |2026-11-14T19:19:51+01:002023-07-08|Building guide|Comments Off on Concealed gutters: where they fit and what they require

Two colours in a metal picket fence: when to keep the palette simple

Two colours can organise the zones of a property or introduce unnecessary chaos. In a fence made of pickets the effect is particularly clear, because each shade is repeated on many elements. Metal fence pickets offer various combination options, but the availability of specific coatings must be confirmed. It is worth starting with the question of what role the second colour is to play. If the answer comes down only to adding variety, it is also worth comparing a calmer variant with a single colour of infill. A fence can be two-colour without alternating different pickets. The second colour can appear on the posts, the frame or the plinth. Such a division corresponds to the construction of the fence and is often easy to read. It is worth considering it first. It allows a repeatable rhythm of the infill to be maintained while clearly showing the larger fields of the structure.

By |2026-11-15T17:54:52+01:002023-07-04|Building guide|Comments Off on Two colours in a metal picket fence: when to keep the palette simple

Ordering trapezoidal steel roofing: from roof measurements to sheet sizes

Begin by establishing what function the trapezoidal sheet is to serve: whether it will be external cladding, wall lining, or a load-bearing element of another system. This determines the choice of profile and documentation. Next, check whether the building is heated and where moisture may come from, and plan for rooftop equipment and point loads. Prepare a sketch with dimensions of the roof slopes, eaves, ridges and pitch. In an existing building, check the plane and condition of the supports. Remember that T18 and T35 designations do not define a single geometry – verify height, rib pitch and coverage width.

By |2026-11-14T16:06:27+01:002023-07-02|Building guide|Comments Off on Ordering trapezoidal steel roofing: from roof measurements to sheet sizes

How to choose a coating for tile-effect steel roofing

The choice of a metal roof tile depends on the entire coating system, not just colour or lacquer thickness. A building owner should check how the metallic protection, pre-treatment layers and organic coating work together in the specific environment. This article covers finish types, the influence of surroundings, the meaning of gloss and texture, and the real scope of a warranty. It also stresses that comparing offers requires identical sheet parameters and full technical data. The decision becomes informed when corrosion resistance, installation conditions and subsequent care are weighed together, rather than relying on a trade name.

By |2026-11-14T19:21:41+01:002023-06-17|Building guide|Comments Off on How to choose a coating for tile-effect steel roofing

BauderPIR M/MF: selecting properties from current documents

For M/MF, the lambda value must be assigned to a specific thickness. For example, 100 mm should be calculated using the applicable range, not the value for the aluminium-faced board. It is worth recording the mineral facing and the M or MF edge separately, so that a substitute product can be assessed against the full set of relevant characteristics. The BauderPIR M/MF specification should identify the function the roof with the mineral-faced PIR board is to fulfil. The area of the fleece under the waterproofing layer is an element that requires an unambiguous description. The input data should include the thickness of the insulation ordered and the condition of the substrate under the covering, not only the area to be insulated. The coordinating document remains the set of documents for the specific M or MF thickness and the connection to the covering.

By |2026-11-16T00:53:03+01:002023-06-15|Building guide|Comments Off on BauderPIR M/MF: selecting properties from current documents
Back to top