Specifying SOPREMA EFYOS BLUE A: properties, edges and applications
PIR insulation
The BLUE A design specification gives only the name and thickness. The edge variant and a reference to the parapet detail are missing. The specification should allow the delivery to be checked without having to guess the author’s intention. Otherwise, two different boards may be treated as the same procurement item. The EFYOS BLUE A specification should identify the function that the thermal insulation of the flat roof beneath the waterproofing is to perform. The termination of the thermal insulation at the parapet is an element requiring an unambiguous description. The input data should include the height of the parapet above the target covering surface, not only the area intended for thermal insulation. The parapet section with the levels of all layers remains the coordinating document.

In this article
Input data for the specification
It must be recorded who confirms that the task can be carried out: accommodating the thermal insulation layer and maintaining the correct termination of the waterproofing. In this respect, the person responsible should be the designer of the roof cross-section, in accordance with the division of design work.
The product itself and the scope of its data
EFYOS BLUE A is described as a board whose PIR core is faced on both sides with 50 μm aluminium. For the calculation of the building component, the declared λD of 0.022 W/(m·K) is assumed; for a thickness of 100 mm the datasheet states RD 4.50 m²K/W, and for 120 mm – 5.45 m²K/W. The result of the compression test is described as CS(10/Y)120, and the reaction to fire is specified as E. Since straight or milled edges are permitted, the external dimension of the sheet does not determine the coverage area – therefore the edge variant must be specified in the specification, and not merely the thickness. The system discussed here is thermal insulation of a flat roof under waterproofing; the properties are attributed to the complete board together with the facings, and not to the core alone.
What the presented calculation covers
In the parapet detail with EFYOS BLUE A, mark the board thickness and the level of the upper surface of the thermal insulation. For the example of 100 mm with a lambda of 0.022 W/(m·K), the operation 0.10/λ gives approximately 4.55 m²K/W. This is an auxiliary calculation, not an RD value copied from the declaration. Enter the declared data according to the product document in the specification, and for the cutting plan assume the coverage appropriate to the ordered edge.
For EFYOS BLUE A, the distinction between the product data and the result of the overall solution must be maintained. The analysis uses the characteristic: lambda 0.022 W/(m·K). The assessment must take into account the limitation: height limit for the flashing. Before approving the variant, the level of the covering must be compared with the flashing drawing and the result recorded in the documentation. Reproducing the assumptions is made possible by the parapet cross-section with the levels of all layers. This ensures that a later comparison with another offer does not omit the element described as the termination of the thermal insulation at the parapet.
Conditions for assessing the variant
In the project, the action described as increasing the board thickness can be compared with the solution of refining the detail at the roof perimeter. The criterion should follow from the need to accommodate the thermal layer and maintain a correct termination of the waterproofing. For EFYOS BLUE A, keeping a single figure from the datasheet does not mean the entire cross-section is equivalent. The requirements must also take into account the plain or milled edge, depending on the variant. Assigning the entire available height to the insulation alone should be excluded, because this changes the meaning of the recorded parameter. The decision should be presented by the designer of the roof cross-section, together with the scope of changes for adjacent materials. The adopted variant must be linked to the schedule: a list of thicknesses, edges and coverage area.
Description of the execution of the relevant joint
The drawing should clearly indicate the termination of the thermal insulation at the parapet. In the case of EFYOS BLUE A, the surface of the material formed by the blue aluminium facing must also be described. The preparation must ensure support for the boards with a load-distributing layer. The required inspection point occurs before the stage described as the waterproofing covering above the board. The basis for acceptance is the record of the thickness and edge variant from the label, assigned to the drawing and the place of execution. Such a description limits discretionary decisions by the crew at a point that will not be visible later.
Delivery and acceptance documents
The delivery of EFYOS BLUE A should be assignable to a single specification item. This item is expanded by the list of thicknesses, edges and coverage area; each described feature should have a reference to the project. A record of the thickness and edge variant from the label is needed, allowing the variant and the manner of its use to be confirmed. If conditions change, the height limit at the flashing must be reconsidered. The update should be agreed by the designer of the roof cross-section before the next layer conceals the discrepancy. The polyurethane insulation is thus linked to the executed scope, which is the thermal insulation of the flat roof under the waterproofing.
A record that can be verified later
The final description of EFYOS BLUE A should allow the adopted decision to be reproduced without guessing its purpose. In this case, the purpose can be defined as the need to accommodate the thermal layer and maintain a correct termination of the waterproofing. The description should be accompanied by the parapet cross-section with the levels of all layers. Separately, it is worth indicating the termination of the thermal insulation at the parapet where its solution differs from the main field. The record should cover the entire required scope. When proposing a substitute, the level of the covering must be compared again with the flashing drawing, instead of basing the assessment solely on the name PIR. Polyurethane boards are then compared according to verifiable features and their effects on the specific cross-section.