About PiVi

This author has not yet filled in any details.
So far PiVi has created 1503 blog entries.

Cold-formed steel sections: why the lightest option may cost more overall

The mass of the structure matters, but it does not show all the costs. A lighter profile may require more components, different connections or additional work. Conversely, a small increase in mass can simplify installation. Optimising cold-formed profiles should therefore cover the entire system. Comparing kilograms alone or the price per metre sometimes leads to a decision that looks good in only one table. Variants should be compared under the same loads and service conditions. Permissible deflections, durability and the geometry of the enclosure are important. A solution cannot be considered cheaper if it omits some of the requirements. First, it is necessary to establish what each variant is to provide.

By |2026-11-15T17:54:13+01:002023-12-16|Building guide|Comments Off on Cold-formed steel sections: why the lightest option may cost more overall

When can you use second-grade trapezoidal steel sheets for roofs and façades?

Second-grade trapezoidal sheet may be suitable for a roof or façade only when the parameters of the specific batch and the reason for the price reduction are known. It is necessary to establish whether the issue is an appearance defect or damage that hinders tight installation or affects load-bearing capacity. The term “second grade” alone does not indicate what deviates from the requirements. Before deciding, the profile, thickness, steel grade and coating must be confirmed, and the geometry and connections assessed. The final selection is left to the designer.

By |2026-11-14T16:06:29+01:002023-12-14|Building guide|Comments Off on When can you use second-grade trapezoidal steel sheets for roofs and façades?

Choosing a covering for a gable roof

The choice of roofing for a gable roof depends on how well it matches the roof plane geometry, pitch and intended use of the loft, not on the shape name alone. Check the evenness of the structure, the line of the eaves and the number of obstacles such as windows and chimneys, as these affect the amount of cutting. Compare cut and modular metal roof tiles and trapezoidal sheet for transport, installation organisation and the full cost including details. Remember that weathertightness comes from correct laying and support, not the number of joints. Ask each supplier to set out what the price covers before choosing a system.

By |2026-11-14T19:19:33+01:002023-12-12|Building guide|Comments Off on Choosing a covering for a gable roof

Choosing roof rafters and understanding their cost

The choice of rafters is determined by the complete structural arrangement, not by a single dimension found online. Their cross-section and spacing follow from calculations that take account of supports, span, pitch, loads and timber class. The building owner should check whether the design covers the connections at the ridge and supports, and whether the order specifies cross-sections, lengths, quantities and the required material class. It is also worth establishing who verifies deviations on site. Cost does not end with the price of a beam: it includes preparation, transport, connectors, protection and installation, and in a replacement also temporary support.

By |2026-11-14T22:52:55+01:002023-11-27|Building guide|Comments Off on Choosing roof rafters and understanding their cost

termPIR ETX in ETICS specifications: lambda, facing and fixings

In an ETICS specification it is not enough to enter any PIR board with a given lambda. termPIR ETX has a defined facing, installation conditions and a range of parameters. The design should preserve this identity and specify the complete set of cooperating façade components. termPIR ETX is a PIR board with a gas-permeable facing made of glass fleece. The manufacturer intends it for two-layer walls in the ETICS system. In the application specification described as PIR boards, clearly indicate the façade where the limited reveal width makes it difficult to use thick insulation. The thermal insulation at the window frame must remain continuous with the boards laid on the full wall, and the adopted variant must be clearly marked in the documentation.

By |2026-11-16T00:51:53+01:002023-11-24|Building guide|Comments Off on termPIR ETX in ETICS specifications: lambda, facing and fixings

Deciding between a roof repair and a new covering

The scope of work should be decided by the technical condition of the covering and structure, not the age of the sheet metal. Before choosing repair or replacement, establish the cause of the damage and check the layers beneath the covering — from outside and from the loft. A single leak does not mean the whole roof slope must be stripped, just as a tidy appearance does not guarantee sound supports. Assess the extent of corrosion, the state of fixings and any deflection. Only this diagnosis allows variants to be compared sensibly and shows whether a local repair will suffice.

By |2026-11-15T03:01:54+01:002023-11-15|Building guide|Comments Off on Deciding between a roof repair and a new covering

Modular metal roof tiles or sheets cut to length for each slope?

The choice between modular and cut-to-size metal roof tiles depends primarily on the roof geometry and transport conditions, not on the format alone. Check whether the roof is simple or has valleys and corners, what delivery options are available, and how the sheets are laid out. Compare two layouts for the same roof plan, taking into account the number of elements, offcuts and installation method. Remember that durability is determined by the material and the execution of details, not by sheet length. A full quote should cover accessories, flashings, waste, delivery and installation.

By |2026-11-15T03:01:10+01:002023-11-10|Building guide|Comments Off on Modular metal roof tiles or sheets cut to length for each slope?

Controlling noise and reverberation in a steel-framed building

In an empty building, conversation can echo off the walls and roof. Once machinery starts up, further sound sources are added to these reflections. A steel-framed hall therefore needs a well-considered acoustic solution. Changing the core of the panel is not always enough, because noise reaches people and the surroundings by several different routes. The source may be machinery, fans, transport and impacts of materials. The nature of the work and the operating time of the equipment matter. A steel-framed hall with a single loud workstation requires a different approach from a facility with many distributed sources. The assessment should include measurements and the conditions in which the problem is greatest.

By |2026-11-15T03:02:57+01:002023-11-02|Building guide|Comments Off on Controlling noise and reverberation in a steel-framed building

Choosing the envelope for a warehouse kept at a low temperature

Not every warehouse needs office-like temperatures. That does not mean, however, that its building envelope can be chosen without analysis. A steel hall maintained at a low temperature should protect goods against the conditions that actually harm them. Sometimes frost and moisture are the most important factors, and sometimes it is limiting fluctuations when gates are opened. First, the requirements of the stored materials must be checked. A temperature above zero may be needed for products containing water, but it is not a universal rule for the entire product range. Humidity and the permissible rate of change also matter. A steel hall should be designed for the described range of conditions, without guessing the warehouse's needs.

By |2026-11-15T03:02:41+01:002023-10-30|Building guide|Comments Off on Choosing the envelope for a warehouse kept at a low temperature

What do you need to know before buying insulated wall panels with a mineral wool core?

It is worth preparing the purchase of insulated wall panels with a mineral wool core as a complete cladding order. You need to establish the parameters, dimensions and details, then plan delivery and installation. The wall area alone is not enough to place an order. The panels must fit the structure, openings and fire requirements. A well-prepared material list reduces waste and the risk that a small but essential item will be missing on site. Insulated wall panels have metal facings and a bonded insulating core. They form finished cladding surfaces once fixed to the designed structure. Variants with a mineral wool core are used, among other things, where fire requirements are important. However, they are not a material with one common specification.

By |2026-11-14T09:55:21+01:002023-10-22|Building guide|Comments Off on What do you need to know before buying insulated wall panels with a mineral wool core?
Back to top