About PiVi

This author has not yet filled in any details.
So far PiVi has created 1503 blog entries.

Replacing a roof covering: what to check before work starts

Before ordering a new roof covering, establish what lies beneath the existing one and whether the structure is ready for replacement. This guide sets out how to assess the old substrate, plan the stages of stripping and prepare the area around the building. Check records of earlier repairs, the condition of the roof frame and how moisture is managed, since replacing the visible layer alone does not always solve the problem. You will also learn how to match the support to the sheeting and limit damage during installation. Leave design decisions to the specialist.

By |2026-11-14T19:19:49+01:002024-01-21|Building guide|Comments Off on Replacing a roof covering: what to check before work starts

Modular tile-effect sheets: advantages and installation planning

Modular metal roof tiles are not a universal solution — their suitability depends on the specific roof and how it is installed. Before buying, check the module's coverage area after overlaps, the requirements for the substrate and ventilation, and the full cost for the given roof slope. Smaller sheets make transport and work planning easier, but they do not remove the need for careful preparation of flashings and checking the geometry of the first row. The comparison should be based on an actual layout, not on one common module size.

By |2026-11-14T19:19:54+01:002024-01-13|Building guide|Comments Off on Modular tile-effect sheets: advantages and installation planning

Is it worth insulating a 1990s house from the inside?

Insulating a 1990s house from the inside can improve comfort when the façade is to remain unchanged. However, it is not a simple solution for every building. First, the existing layers, moisture and thermal bridges must be identified. PIR helps retain more space in the rooms, but requires airtight details and proper finishing. It is also worth comparing the scope of work with external insulation. Houses from this period may have been built from various materials and according to various solutions. Some have cavity walls, others have external insulation added during renovation. The cavity in the wall may be unfilled, partially filled or contain material of unknown condition.

By |2026-11-14T09:55:55+01:002024-01-06|Building guide|Comments Off on Is it worth insulating a 1990s house from the inside?

How can you sensibly insulate a garage, outbuilding or summer house?

A garage, workshop and summer house each need a different approach to insulation. First you need to establish whether the building will be heated and how often it will be used. PIR achieves a good thermal resistance at a small thickness. In many renovations this is a major advantage. It does not, however, relieve you of repairing leaks, sorting out ventilation or checking the substrate and finish. An unheated garage is planned differently from a workshop where people work every day. In an unheated room, insulation slows the rate of temperature change. On its own, however, it will not guarantee a temperature above freezing during a long frost. You need a heat source or another realistic balance of gains and losses.

By |2026-11-14T09:55:36+01:002024-01-03|Building guide|Comments Off on How can you sensibly insulate a garage, outbuilding or summer house?

Matt or gloss: how to choose a finish for tile-effect metal roofing

What matters is whether the finish suits the specific coating and the surrounding conditions, not the matte-versus-gloss distinction alone. Before ordering, check the coating's intended use, its declared properties, and the compatibility of flashings and gutters. View a sample outdoors, at an angle close to the roof pitch and in different lighting conditions. Bear in mind that matte and gloss are not by themselves a measure of corrosion resistance or steel quality. Only after these checks should you compare the price of the entire covering.

By |2026-11-14T16:08:46+01:002024-01-03|Building guide|Comments Off on Matt or gloss: how to choose a finish for tile-effect metal roofing

EFIGREEN ALU+ and ALU+ XL: data for comparing variants

With ALU+, the specifier should distinguish between the basic format and the XL variant. Thermal data must be assigned to the selected thickness. The fire requirement must not be supplemented with a default class instead of NPD. If it is required by design, the correct basis of assessment for the specific solution must be obtained. The EFIGREEN ALU+ specification should identify the function that the thermal insulation of a roof slope intersected by numerous service penetrations is to fulfil. One element requiring an unambiguous description is the narrow field between two service bases. The input data must include the strip width and the lengths available for laying full sheets, not only the area intended for thermal insulation. The cutting plan for the specific ALU+ or XL format remains the coordinating document.

By |2026-11-16T00:52:45+01:002024-01-02|Building guide|Comments Off on EFIGREEN ALU+ and ALU+ XL: data for comparing variants

First- or second-grade sandwich panel? What to check before choosing

A first-grade panel gives a simpler starting point for design and ordering. With second grade, you first need to know the specific defect. A low price may result from colour, length or damage that changes the suitability of the element. Before purchase, check the batch marking, documents, and the condition of the locks and both facings. Only then assess whether the saving remains after cutting, repairs and installation. The second-grade designation does not describe one fixed quality. Under this label, end-of-series runs, panels with appearance deviations and damaged elements may be sold. The name outlet alone also does not explain the reason for the markdown. It gives no basis for assuming that every parameter has remained unchanged.

By |2026-11-14T12:16:31+01:002024-01-01|Building guide|Comments Off on First- or second-grade sandwich panel? What to check before choosing

Choosing a joint for timber beams

What governs the choice of joint for timber beams is chiefly the forces that the connection has to carry, rather than how the detail looks. A beam resting on a support is treated differently from one extended along its length. It is therefore worth checking the structural design first to establish whether the joint resists compression, tension, shear or other actions, and then comparing the notch geometry, the type and spacing of fasteners and the moisture conditions against the documentation. Two apparently similar beam crossings can perform differently in a roof and in a floor, so judging from a photograph alone may prove misleading.

By |2026-11-14T22:53:15+01:002023-12-27|Building guide|Comments Off on Choosing a joint for timber beams

What does building a passive house involve?

A passive house is not a single product but a set of criteria assessed by a defined method, so it is worth checking whether the design and construction meet them together. Rather than asking only about insulation thickness, it is better to establish how shape, airtightness and services affect the balance and comfort. This article discusses the choices and trade-offs facing the building owner and the trade. It helps distinguish the passive standard from the loosely used term energy-efficient and shows what really determines the outcome.

By |2026-11-14T22:53:44+01:002023-12-21|Building guide|Comments Off on What does building a passive house involve?

Designing a coordinated metal picket fence: from concept to specification

A fence project can easily fragment into separate decisions. First the colour is chosen, then the gate, and only at the end does one try to match the missing bays. Metal pickets offer many possibilities, but they are best used within an orderly plan. It is worth moving from the function of the property to the geometry, and only then to the finish. This order helps create a coherent appearance and an unambiguous order. It does not require complicated drawings at every stage, but it does need a few specific determinations. Start by dividing up the property. Mark the entrance, the driveway, the rest area and the quiet rear. For each section, note whether openness, screening or easy access for maintenance is more important. This allows photos to be assessed according to your own needs. Not every attractive fence will suit the actual layout of the plot.

By |2026-11-15T17:55:07+01:002023-12-20|Building guide|Comments Off on Designing a coordinated metal picket fence: from concept to specification