Building handbook
The Izoprofil.eu handbook covers roofing, wall cladding and insulation, from reading specifications to preparing an order. Find guidance on sandwich panels, PIR boards, trapezoidal sheets and metal roof tiles. Understand overall sheet width and effective cover width, compare insulation options and plan installation details. The articles also cover renovation, material storage and costs that are easy to overlook. Worked examples explain the calculation method. Check the design and product documentation before making the final selection. Once you have identified the material, prepare the dimensions, quantity and delivery location for a quote.
Planning a sandwich panel garage and estimating the build cost
A garage from insulated panels can be built efficiently if you plan the foundation, structure, door and cladding in advance. The price of the panels alone is not enough to determine the budget. The way the garage is used also matters. A cold storage space for a car requires a different solution from a heated workshop. First establish the dimensions and requirements, then order the material. Note the car dimensions, the space needed at the door and the space for shelving. The external width of the garage is not the clear drive-through width. Some of the space will be taken up by columns, door tracks and wall layers. Also check the height of the open door and any drive unit. These centimetres are difficult to recover once the roof is installed.
Can you walk on insulated roof panels?
Can you walk on a sandwich roof panel? The answer depends on the specific assembly, not on panel thickness alone. Before stepping onto it, check the manufacturer's documentation, the support spacing, the fixing pattern and the technical condition of the roof. Snow load capacity does not automatically permit any point load, so it is worth establishing what service conditions are envisaged for the given roof. A completed, fixed roof is treated differently from a loose panel or a stored pack. Where equipment is serviced regularly, it is worth providing suitable routes and walkways.
What makes insulated roof panels easier to install?
Installing a roof sandwich panel is made easier above all by checking the supports and details in advance — this step prevents the greatest number of problems. It is worth verifying that the structure matches the design, along with the spacing and straightness of the supports and the condition of their protection, because unevenness hinders fitting and can deform the facings during fixing. The factory-made product itself combines an outer steel facing, an insulating core and an inner facing, and its geometry and properties are strictly defined. Permissible spans should be read for the specific panel variant and load conditions, not inferred from insulation thickness alone.
How to choose a PIR board under render for an aerated concrete wall?
For an aerated concrete wall, choose a PIR board intended for the given façade system. A good lambda value alone is not enough. What matters is the adhesion of the facing, the fixing into the substrate and the correct execution of the reinforced layer and render. The insulation thickness follows from the wall parameters and the thermal target. There is no single value suitable for all blocks. Aerated concrete comes in various grades and thicknesses. Its thermal and mechanical properties depend on the specific product. When selecting insulation, do not assume the parameters of the warmest block if it is not known what the wall was built from. Check the documentation or carry out the necessary inspection.
Air humidity and cold roof surfaces: why roofing alone is not enough
The building owner often looks for the cause of moisture solely in the covering. Meanwhile, the conditions under the roof can change once a wet load is introduced, the heating is switched on or the gates are closed. Corrugated fibre cement sheets react to their surroundings just like the other materials of the building envelope. Asbestos-free fibre cement does not regulate the interior humidity on its own. To limit water on the cold roof slope, its sources and the way air is exchanged must be identified. A percentage humidity reading is not straightforward information about the amount of water in the entire room. A change in temperature also changes this indicator. That is why two measurements taken at different times require context. Merely heating the air can lower its relative humidity without removing moisture from the building.
Above-rafter PIR insulation: designing details and fixings
The specification for an above-rafter (PIR) roof should go beyond the insulation thickness. PIR boards must be tied to the substrate, the protective layers and the load transfer. The design should also clearly show the junction between the roof slopes and the façade, and the terminations at openings. PIR boards laid above the rafters form a layer that also covers the timber structural elements. This allows their contribution to heat flow through the roof to be reduced. The calculation must take into account the actual sequence of layers through the construction. A continuous layer above the rafters has a different geometry from the bay infill alone. The thermal calculation must reproduce the actual non-uniformity of the roof.





