Declared lambda, R and U: specifying PIR insulation correctly

PIR insulation

At a glance

In technical documentation, lambda, R and U should each be assigned an unambiguous meaning. A mix-up between a material property and a result for the building element can carry through into the order. PIR boards require a description of the specific variant and thickness. A well-prepared specification makes it possible to reconstruct the basis of the calculation. The facing temperature is not the same as the mean temperature of the entire insulation layer. The dependence of conductivity on temperature requires the correct material data. It must not be claimed that every PIR has constant properties under all conditions. Likewise, all mineral wools must not be assessed from a single graph. For the lambda value, state the product, the thickness range and the document on which it is based.

Two PIR boards with pale cores and silver-coloured faces, one upright and one lying flat

What the lambda of a specific product says

If a design value different from the declared value was adopted for the calculation, explain this in the appropriate place. Polyurethane boards should not be represented by a single number without specifying the variant. Such a notation makes it difficult to assess a substitute. The assessor must know whether the difference results from a different material, a different facing, or merely from a different way of presenting the data.

Thermal resistance of the selected layer

The thermal resistance of the PIR layer is calculated from the thickness expressed in metres, not millimetres. For 120 mm we obtain 0.12 m; with a lambda of 0.022 the result is approximately 5.45 m²K/W. This value applies solely to the PIR layer and enters into the sum of the resistances of the entire system. In the specification it is worth stating it together with the thickness and lambda so that, at the stage of drawing coordination and ordering, it can be verified that the quantity of insulation has not been changed.

The resistance of the layer itself can be used as a clear point of comparison. However, the correct units must be retained and a simple quotient of d and lambda must be distinguished from the value declared in the product documents. In the bill of materials it is worth giving the required thickness together with the corresponding R. This makes it possible to detect a substitution that retains the series name but reduces the quantity of insulation. The mere general term equivalent does not provide such a possibility of control.

How to read the U-value of the entire building element

A PIR board does not have a single U-value independent of the manner of installation. The product is described by, among other things, the lambda and the resistance for a given thickness. The U-value is determined for the assumed cross-section. Only such a result can be related to the project requirements and checked together with the connection details.

The U-value result should be linked to the section number or to a description of the entire building element. Where there are several construction variants, a single shared value may be unclear. It is worth noting the corrections taken into account and the boundaries of the calculation. Polyurethane insulation then remains a recognisable component of the system. A change in the method of fixing or in the geometry will not be treated as immaterial merely because the same core thickness has been retained.

Thickness and space constraints

When comparing offers, it is worth establishing the required thermal effect first. Only then should the thicknesses of different products be selected. A comparison of equal thicknesses may show the characteristics of the materials, but it will not answer the question of the cost of achieving the same goal. Both comparisons are useful if you describe the assumptions clearly.

Compare thicknesses for a consistent thermal goal, and then check their availability and their effect on the details. A mathematical result does not always coincide with the commercially available dimension. The documentation should indicate the variant finally selected. The contractor should not be left with the task of rounding the required thickness independently. Where space is limited, the entire section must be resolved, including the finish and the planned connections to adjacent elements.

Limits of the conclusions drawn from calculations

The selection of PIR thickness does not follow from a single universal value for roofs and floors, because each case has different boundary conditions, requirements and remaining layers. The required resistance is therefore determined for a specific building element, not for a product type. A calculation example from the internet may explain the arithmetic, but it does not replace a design; the specification and the drawings must indicate the variant adopted for the given location.

Do not infer from the declared lambda a statement of constant behaviour at every temperature. Material properties depend on conditions, and design calculations have defined rules. Polyurethane foam is no exception exempting you from this caution. If the problem under analysis goes beyond the typical range, appropriate data are needed. It is particularly unjustified to replace a summer comfort analysis with a simple conversion of a single parameter.

From parameters to correct execution

With two layers of boards, an appropriate offset of the joints can limit continuous gaps. The method of execution must match the system and the fixing. However, the second layer must not be treated as a justification for defects in the first. The boards should have correct support and a stable position.

In the execution part, indicate details that maintain the continuity of the layer. A calculation will not protect against an accidental gap created during installation. The polyurethane insulation should have its joints, perimeter and rules for substituting auxiliary materials described. It is also worth specifying the point of acceptance before covering. As a result, the thermal requirements have corresponding inspection actions on site, instead of remaining solely a number in the descriptive part of the design.

Recording the decision in the documentation

In the specification of the two variants, state the same target value and the same boundary conditions. If one result concerns a homogeneous cross-section and the other takes the construction into account, they are not directly comparable. The method must first be harmonised, then the numbers assessed.

Clear documentation runs from the product data through the calculation to the drawing and the order. Each of these places should refer to the same variant. If a proposed substitute changes the lambda or the thickness, the check covers the entire relevant scope again. PIR boards do not require any special treatment beyond the usual care in selection. Their advantage in restricted spaces only becomes clear once the values have units, a source and a properly defined subject.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project