SOPREMA PIR boards: specifying product and system requirements

PIR insulation

At a glance

The specification for a BLUE A roof should link the list of materials with the details. If a different designation appears on the drawing than in the cost estimate, the discrepancy must be clarified before purchase. It is worth specifying the points at which the layers that will be covered are to be inspected and accepted. Such a record gives the contractor a verifiable requirement instead of a general note about airtightness. The EFYOS BLUE A specification should identify the function that the complete roof with vapour control layer, thermal insulation and covering is to perform. One element requiring an unambiguous description is the connection of the vapour control layer to the rooflight upstand. The input data should include the position of all layers at the base of the rooflight, not only the area intended for thermal insulation.

Board with a blue face and visible pale core, thermal insulation beneath waterproofing in a SOPREMA roof assembly

Input data for the specification

The coordinating document remains the skylight detail with a separate line for each protective layer. It should be recorded who confirms that the task can be carried out: keep thermal continuity, airtightness and protection against rain separate. In this respect, the person responsible should be the coordinator for the execution of all roof layers, in accordance with the division of design work.

The correct product and the scope of its data

EFYOS BLUE A is included in the construction design and detailed drawings as a thermal layer with a PIR core and aluminium facings; for this product, λD 0.022 W/(m·K), a compression level of CS(10/Y)120 and a reaction to fire of E are stated. These three data characterise the product itself, so in the specification they do not replace the description of the adhesive, covering, vapour control layer or the classification of the finished roof covering — each of these components needs a separate task in the roof design. Therefore, PIR SOPREMA boards are considered here as part of the roof assembly, including its vapour control layer, insulation and outer covering, and not as a standalone element. In EFYOS BLUE A, the polyurethane foam of the PIR type is the core, while the properties of the complete board also include the facings; polyurethane insulation means in this case the installation of factory-made boards in a defined layer arrangement.

What the presented calculation covers

A good check of the specification is an attempt to find three functions at each penetration on the drawing. The EFYOS BLUE A thermal insulation, the vapour control solution and the protection against rain should be indicated. If the bill of materials contains any of these components but the drawing does not show its connection, the documentation requires completion. It is not about increasing the number of names in the schedule. What is needed is an unambiguous link between the product and the activity being performed.

For EFYOS BLUE A, the distinction between the product data and the result of the entire solution must be maintained. The analysis uses the characteristic: aluminium facing of the board with a lambda of 0.022 W/(m·K). The assessment must take into account the limitation: access to the sealing after the subsequent layers have been laid. Before approving the variant, each layer should be traced from the roof field to the termination at the vertical upstand and the result recorded in the documentation. Reproducing the assumptions is made possible by the skylight detail with a separate line for each protective layer. As a result, a later comparison with another offer does not omit the element described as the connection of the vapour control layer to the skylight upstand.

Conditions for assessing the variant

In the design, it is possible to compare the action described as repair of a missing connection at the skylight with the solution of increasing the thickness in the central area of the roof slope. The criterion should follow from the need to maintain thermal continuity, airtightness and protection against rain separately. For EFYOS BLUE A, retaining a single figure from the data sheet does not mean equivalence of the entire cross-section. The requirements must also take into account the joining of insulation sheets that does not replace the sealing of the vapour control layer. It must be ruled out that the foil on a single board is regarded as an airtight vapour control layer for the entire roof, because this changes the meaning of the recorded parameter. The decision should be presented by the coordinator for the execution of all roof layers, together with the scope of changes for adjacent materials. The adopted variant must be linked to the schedule: one list of materials linked to the cross-section and details.

Description of the execution of the important joint

The drawing should clearly indicate the connection of the vapour control layer to the skylight wall. In the case of EFYOS BLUE A, the surface of the material formed by the aluminium facing of EFYOS BLUE A must also be described. The preparation must provide a substrate prepared for fixing the entire roof covering. The required inspection point occurs before the stage described as covering with skylight flashing. The basis for acceptance is a set of photographs of the continuous connections before they are covered, assigned to the drawing and the execution location. Such a description limits discretionary decisions by the crew at a point that will not be visible later.

Delivery and acceptance documents

The delivery of EFYOS BLUE A should be assignable to a single specification item. This item is expanded by one list of materials linked to the cross-section and details; every described feature should have a reference to the design. A set of photographs of the continuous connections before they are covered is needed, allowing the variant and the manner of its use to be confirmed. If conditions change, access to the seal after the laying of subsequent layers must be reconsidered. The update should be agreed by the coordinator for the execution of all roof layers before the next layer conceals the discrepancy. In this way, the polyurethane insulation is linked to the executed scope, including all components of the completed roof: vapour control, insulation and roof covering.

A record that can be verified later

The final description of EFYOS BLUE A should make it possible to reproduce the adopted decision without guessing its purpose. In this case, the purpose can be defined as the need to maintain thermal continuity, airtightness and protection against rain separately. The description must be accompanied by a skylight detail with a separate line for each protective layer. The connection of the vapour control layer to the skylight wall should be indicated separately where its solution differs from the main field. The record should cover the entire required scope. When proposing a substitute, every layer must be traced again from the roof field to the termination at the vertical wall, instead of basing the assessment solely on the name PIR. Polyurethane boards are then compared according to verifiable features and their effects on the specific cross-section.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project