Is the lowest lambda value enough to select foundation insulation?

EPS and thermal insulation

At a glance

At the foundation, a low lambda value is important, but it is not enough to choose EPS. The board must match the water conditions, the loads and the installation location. Insulation on a vertical wall has a different task from the material under a loaded slab. Data on water absorption, compression and long-term performance are needed. Waterproofing remains a separate layer. The ground, the water level and the method of rainwater drainage must be identified. Contact with a damp substrate differs from periodic or constant exposure to water. The design should specify the conditions to which the insulation will be exposed. A material should not be chosen solely on the basis that a neighbouring house was insulated with a similar board.

EPS board by a jar of water and a calliper, illustration for choosing foundation insulation

Start with the conditions at the building

The water situation and the structure may be different.

The place of application also matters. EPS on the outer side of a foundation wall performs differently from EPS under a floor finish or under a load-bearing foundation slab. In the latter case, demanding loads and structural deformations are added. The general name foundation does not mean approval for all these places. An unambiguous intended use for the specific product is required.

How does lambda relate to moisture?

The declared lambda describes the material on a specific test basis. In the design, the value appropriate for the service conditions must be adopted. Moisture can change heat conduction. Therefore, a very low figure on the label of a dry board does not settle the effect in every contact with the ground. Limiting water ingress and documented application are also important.

It is not worth comparing only two lambda values while ignoring water absorption. Boards with a similar resistance can have different water-related parameters. Also, thinner insulation with a better lambda may require a different detail solution. The connection to the plinth and the floor insulation must be checked. The most favourable material result does not eliminate a thermal bridge left at the edge of the structure.

What does the WL(T) designation say?

WL(T) refers to long-term water absorption by total immersion in a specified test. The declared level is expressed as a percentage relative to volume. For example, the designation WL(T)2 refers to a level of no more than 2% under the conditions of this test. It is not a promise that the board will never be damp or that it will reach exactly this state in every ground.

In EPS documents intended for foundation zones, various levels can be found, including 2, 4 and 5. The same parameter and method must be compared. Short-term water absorption, immersion and diffusion are not interchangeable results. The absence of a declaration for a given property does not mean a value of zero. If the design requires it, the relevant data must be obtained before accepting the board.

Loads require separate verification

On the foundation wall, the backfill conditions and protection during the works must be taken into account. Under the slab or floor, it is essential that the pressure is transferred through the entire system. CS(10) means the compressive stress at 10% deformation, not a safe long-term load. To assess permanent pressure, data on creep and requirements for permissible displacements are needed.

Insulation under a structure should not be selected on the basis of advice for an ordinary residential floor. The forces, the distribution of pressures and the consequences of deformation differ. The designer can specify a suitable EPS or another material. XPS also requires the specific grade to be checked. Belonging to the group of extruded polystyrenes does not in itself replace documentation and calculations.

Why does EPS not replace horizontal waterproofing?

The thermal layer does not by itself form a watertight barrier. Board joints and penetrations are not equivalent to waterproofing selected for the ground conditions. It must be installed in the intended location and protected against damage. The boards can participate in protecting the system, but they do not justify omitting the sealing of the wall, the connection to the footing or the penetration of a pipe.

The adhesive and other preparations in contact with EPS must be compatible with polystyrene and with the waterproofing layer. Some solvent-containing products may damage it. Fixing should not accidentally compromise the waterproofing. Backfill and protective layers must be carried out in accordance with the design. A correct product is easily damaged if the work stage is treated as ordinary backfilling of the excavation.

How should two offers be compared?

The specification should cover the intended use, lambda, thickness, WL(T) and the required mechanical parameters and durability. The conditions of application and auxiliary materials must be added. If the document for one product does not state the required characteristic, the offers cannot be considered equivalent on the basis of price alone. The manufacturer’s response should relate to the exact place of application.

EPS is produced by, among others, Albaterm, Enerpor, Paneltech and Neotherm. Their ranges include grades with different properties, so choosing a brand is only the beginning. At the foundation, good thermal performance must go hand in hand with suitability for water, loads and installation. Only such a complete set allows the durability of the insulation to be assessed after backfilling, when access to it will be difficult.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote