Specifying acceptance checks for swissporPIR Alu installation
PIR insulation
Acceptance of swissporPIR Alu must be planned at two points: on delivery and immediately before installation, because the condition of the boards may change in between. Linking the batch to the place of use makes it possible to reconstruct the course of the works and to clarify a problem before the layers are covered. It is a rigid board with low thermal conductivity, but its core and thin facings are easily damaged by incorrect handling. The terms “polyurethane boards” and “polyurethane foam” are broader than the PIR product designation, so the description of use must clearly state the condition of the core and facings of swissporPIR Alu immediately after delivery.

In this article
PIR boards from acceptance to the place of use
The functional description should link the acceptance of packs of swissporPIR Alu to the place where the boards will later be used; a shortened material item is not enough, because corner damage can disappear under subsequent layers. The aim is to detect non-conformity before the material reaches the installation positions. In the documentation, include batch markings, photographs of the edges and the scope of elements requiring assessment, and indicate the place of application.
Document parameters and the actual condition of the material
The parameters from the declaration relate to a product with a specific construction and thickness. For swissporPIR Alu, the lambda value is 0.022 W/(m·K), but the declaration is not an approval for arbitrary storage conditions. The calculation schedule should explain local crushing of the board at this declared lambda value.
In the calculations, relate the parameters of swissporPIR Alu to the actual condition and thickness of the material. The data must remain within their range, because sealing the surface does not restore broken foam or lost support. Verification of the solution is to assess the suitability of the fragment without equating the appearance of the facing with complete function. Preserve the actual thickness, continuity of the core and the possibility of a correct connection with the adjacent board.
Polyurethane insulation requiring protection on site
Store swissporPIR Alu boards horizontally on even, hard supports with a gap from the substrate, protecting them from sun, UV radiation and precipitation. The detailed design should indicate such a storage location.
The working drawing should help protect swissporPIR Alu from water, sun and damage during transport, because the transport packaging is not a permanent roof over an exposed construction site. The adopted geometry is to allow the condition of the edges and the dry material to be preserved until installation. For the inspection of works, specify the storage location, the covering of the packs and the route for moving large elements. Also establish the inspection before covering.
Inspection after rainfall and before covering
Before installation, check that the boards are dry and undamaged; the roof instructions require damp insulation to be replaced. In the analysis of the component’s conditions, take into account the dryness of swissporPIR Alu and the cleanliness of the cut joints before covering.
After precipitation, check the condition of the swissporPIR Alu boards and prepare clean edges. The roof instructions require damp insulation to be replaced, not enclosed within the assembly, so the model and the detail must take this into account. The material set is to allow the next stage to be carried out on a correctly prepared and accepted layer. In the specification, describe the condition of the boards, the removal of dust and the protection of the open working edge.
Safe storage location for the batch
The location for temporary storage of swissporPIR Alu pallets on the roof must be described in the usage requirements: the load-bearing capacity of the structure at that point and the protection against wind are subject to inspection. The low mass of a single board does not entitle anyone to place any number of pallets in one place.
When assessing conformity, the load-bearing capacity of the storage location for swissporPIR Alu and the protection against wind are verified, because the low weight of a single board does not confirm that the entire stock can be stacked at one point. The design data must be sufficient to organise transport without excessive pressure and damage to the laid layers. When approving the product, check the unloading plan, the permitted storage zones, the access routes for the crews and conformity with the design.
Insulation with polyurethane: deliveries at the appropriate stages
The quantity of material for delivery is linked to the daily progress of the works and the possibility of closing the layers. An excessive stock on an exposed site raises the requirements for covering and moving. The purchase conditions should specify the delivery schedule for swissporPIR Alu linked to the closing of daily sections.
The material procedure determines how much swissporPIR Alu can be stored and covered in the planned stage. An excess stock increases the protection requirements, while a shortage of a few elements stops the completion of a section. The delivery agreement specifies the division of batches, the order in which the boards are taken and the acceptance dates before covering, so that the decision can be reconstructed after installation and unnecessary moving and downtime can be reduced without risk to the condition of the insulation.
A case worth considering
In the inspection plan for swissporPIR Alu, it is worth separating the acceptance of the delivery from the reassessment before installation, because the condition of the material may change between these stages. The batch marking should be linked to the place of use, and the handling of a damp or damaged element should be described separately. This ensures that the decision is made before the defective part is covered.