Designing with Eurothane G: insulation RD and plasterboard thickness
PIR insulation
The design with Eurothane G should clearly state which parameters relate to the PIR and which relate to the entire composite. The plasterboard has its own thickness and properties. Mixing up these data can overstate the assessed insulation performance or make it difficult to check the dimensions after completion of the works. Recticel Eurothane G consists of a PIR board faced on both sides with a gas-tight facing and with 12.5 mm plasterboard. It is intended for suitable internal insulation applications. In the specification of the application described as PIR boards, clearly indicate the internal wall facing that bonds Eurothane G PIR to the 12.5 mm plasterboard. The wall beneath Eurothane G must be prepared in accordance with its condition and the requirements of the new construction, and the adopted variant must be clearly identified in the documentation.

In this article
Identification and intended use of the product
A shortened record of the name alone is not sufficient, because the factory bonding of the layers does not replace an assessment of the surface to which they are to be fixed. The functional assumptions must allow the composite to be matched to the existing partition and to the intended use of the interior. In the design documentation, include the condition of the wall, the function of the room and the points where the new construction connects to adjacent partitions, together with a reference to the relevant section.
Lambda, thickness and thermal resistance
Assign the Eurothane G lambda value of 0.022 W/(m·K) exclusively to the PIR insulation component. The plasterboard facing has its own thickness and is not the PIR core, so it should not be included in the thermal resistance calculation as if it were insulation. Separating these data in the documentation allows the insulation performance of the composite to be verified correctly and prevents the assessment from being overstated.
When comparing polyurethane boards in calculations, describe separately the difference between the total thickness of Eurothane G and the thickness of the insulating PIR component. In the Eurothane G calculation, lambda 0.022 applies to the PIR component and does not include the gypsum facing, so that each value can be linked to the correct version of the calculation. The parameter must remain linked to the declared range, since treating gypsum and foam identically would overstate the assessment of the composite’s thermal resistance. Verification of the design should allow the effect of the thermal insulation to be compared with the actual loss of space in the room. Retain in the calculations the parameters of the PIR component, the share of the gypsum facing and the correct thermal resistance of the entire product variant, so that a later change of material can be traced.
Interpretation of the mechanical and fire properties
Relate the B-s1,d0 class given for Eurothane G in the design to the specified end use. Do not treat it as proof of non-combustibility of the PIR foam or as automatic fire resistance of the entire building element. Retain this distinction in the specification and on the drawings, so that the assessment of reaction to fire is not extended to the entire wall assembly.
In the table of mechanical and fire requirements, distinguish the plan for heavy fixings passing through the composite Eurothane G facing. The load of heavy equipment must be transferred through the built structure to a suitable substrate, so that the product document does not replace the required assessment of the application. Evidence for one case cannot be extended arbitrarily, because class B-s1,d0 relates to a specific application and does not describe the load-bearing capacity of suspended structures. The product and application documents should allow the equipment fixing to be designed independently of the fire assessment of the material. When approving the material, combine the type of anchors, the installation route and the documentation of the application conditions of the composite in the given interior with the actual configuration of the building element.
The Eurothane G documentation should show the junction cross-section, not just a view of the finished wall. The PIR edge is square, whereas the long sides of the plasterboard are tapered. Each part requires correct execution. In the thermal table, the core and the 12.5 mm plasterboard should be listed separately. Such a record makes both the calculation and the assessment of the solution proposed for execution in a real room easier.
Separation of the functions of the sealing layers
With Eurothane G thermal insulation on the inside, the existing wall changes the thermal conditions, and the gas-tight facings require the continuity of junctions to be designed. In the construction design, indicate how to ensure this continuity and how to assess the wall’s ability to dry out, taking into account the condition of the outer side of the wall.
The moisture condition analysis should cover a wall insulated from the inside whose outer side remains in its existing condition. Before closing the Eurothane G wall, the source of moisture and the wall’s ability to dry out must be established in accordance with the thermal and moisture conditions adopted for the building element. The description ‘polyurethane foam’ does not close the analysis, because the source of water in the wall may still be active despite the dry and even new plasterboard surface. The adopted layers and their junctions must allow the cause of dampness to be removed and the ability to dry out to be verified before the wall is closed. In the specification, explain the traces of leaks, the ventilation of the room and the detail of the insulation junction with the floor and ceiling, as well as the limits of responsibility of the individual layers.
Geometry and detailing of the joints
The 2600 × 1200 mm format makes it easier to plan cut pieces, but the description must distinguish between two edges: the PIR has a square edge, while the longer sides of the plasterboard are tapered for the joint. On the construction drawing, indicate both of these elements and how they are to be checked.
On the construction drawing, precisely describe the chamfered long plasterboard edges and the straight edge of the Eurothane G insulating core. The gypsum joint and the PIR core connection must be planned as two elements of the same interface, and the method of verification must be shown on the construction drawing. This cannot be left solely to the installer’s decision, since a correct joint on the visible surface does not automatically prove a correct PIR interface. The adopted geometry should allow the 2600 × 1200 mm panels to be laid out with account taken of the two functions of their connection. The specified polyurethane insulation requires stating how the position of the joints, the close fitting of the insulating part and the routing of services at the planned cut-offs are to be checked at handover.
Documentation of the conformity of execution
In the quotation, state the thickness of the PIR part and the full scope of finishing works. Agree the fixing materials, the execution of joints and the details at the reveals so that the price reflects a complete installation and not just the board itself.
When checking the item ‘polyurethane insulation’ in the bill of quantities, analyse the wall quotation covering Eurothane G as well as the preparation, fixing and finishing of the reveals. The Eurothane G quotation should also cover the reveals, the perimeter of the installation and work on services, and the agreed criteria must remain clear when assessing a substitute. Compliance with a single characteristic is not enough when the additional cost may arise from substrate repair and numerous short terminations at openings. The materials procedure should allow variants leading to an equally complete and functional internal installation to be compared. In the conformity report, enter the scope of jointing, perimeter connections, wall repairs and relocation of existing service points, so that the decision is not based solely on the commercial description.