Unauthorised construction in Poland: what happens and how can it be put right?
Unauthorised construction can result in works being halted and proceedings before the building supervision authority, and not every irregularity follows the same removal procedure. Before taking any steps, compare the actual structure with the documentation you hold: check the permit, notification, design and subsequent changes. Establish the scope of the breach and the date the works were completed, as these determine the correct procedure. Remember that the absence of a document from your home file does not prove it was never issued – the records may be held at the office. This determination can matter more than preparing a new cost estimate. This guide describes Polish law as at 1 November 2026.









