IKO enertherm MG: using thickness-dependent lambda values in calculations

PIR insulation

At a glance

For MG, the specification must retain the thickness-dependent lambda. At the same time, the surface formed by the coated glass fleece and the method of membrane installation must be stated. A substitute assessed only by thickness can change both conditions. The enquiry should therefore require a comparison of the entire roof build-up and the auxiliary materials. The IKO enertherm MG specification should identify the function that the flat roof is to perform under the synthetic membrane. One element requiring an unambiguous description is the connection of the membrane to the board surface in the fleece. The input data should include the insulation thickness and the condition of the surface before the covering is installed, not only the area to be insulated. The coordinating document remains the roof cross-section with a confirmed method of fixing the membrane.

IKO enertherm MG board with a matt glass-fleece facing and exposed PIR core

Input data for the specification

It must be recorded who confirms that the task can be carried out: selecting the thickness and the compatible method of connection to the membrane. In this respect, the person responsible should be the roof designer working with the specific synthetic membrane, in accordance with the division of design work.

The product concerned and the scope of its data

IKO enertherm MG is described as a board with a PIR core and facings on both sides of perforated, coated glass fleece. The dependence of lambda on thickness is crucial here: for thicknesses below 120 mm, λD is 0.026 W/(m·K), and from 120 mm it is 0.025 W/(m·K). The declared thermal resistance RD of a 100 mm board is 3.80 m²K/W, and of a 120 mm board 4.80 m²K/W. The declared compressive strength is at least 150 kPa, and the reaction to fire is E. The manufacturer envisages use under synthetic membranes, which is why the scope of assessment is limited to a flat roof under a synthetic membrane. The properties of the complete board cover both the PIR core and the facings, and installation means laying the factory-made boards in a defined layer arrangement.

What the presented calculation covers

The acceptance inspection of IKO enertherm MG before covering should include identifying the variant and the condition of the fleece to which the envisaged covering system is to adhere. A thermal example for 100 mm and a lambda of 0.026 W/(m·K) gives 0.10/λ of approximately 3.85 m²K/W. Do not equate this result with the RD declared according to the product documents. In the specification, combine the material data with the roof cross-section and the confirmed method of fixing the membrane, so that the inspection also covers the connection of the layers.

For IKO enertherm MG, the distinction between the product data and the result of the overall solution must be maintained. The analysis uses the characteristic: lambda 0.026 below 120 mm and 0.025 from 120 mm. The assessment must take into account the limitation: the set of requirements for the coated fleece and the waterproofing. Before approving the variant, the compatibility of the covering layer with the coated fleece must be confirmed and the result recorded in the documentation. Reproducing the assumptions is made possible by the roof cross-section with the confirmed method of fixing the membrane. As a result, a later comparison with another offer does not omit the element described as the connection of the membrane to the surface of the boards in the fleece.

Conditions for assessing the variant

In the project, it is possible to compare the action described as selecting the MG thickness for the required resistance and the chosen covering with the solution that consists in reassessing the entire system after proposing a different facing. The criterion should follow from the need to select the thickness and a compatible method of connection with the membrane. For IKO enertherm MG, keeping a single figure from the datasheet does not mean that the entire cross-section is equivalent. The requirements must also take into account the simple contact of the boards under the continuous covering layer. Assigning to the MG board a lambda of 0.022, which is proper to a different variant, must be excluded, because it changes the meaning of the recorded parameter. The decision should be presented by the roof designer working with the specific synthetic membrane, together with the scope of changes for adjacent materials. The adopted variant must be linked to the specification: an MG description covering the thickness, format and method of membrane installation.

Description of the execution of the important connection

The drawing should unambiguously indicate the connection of the membrane to the surface of the boards in the fleece. In the case of IKO enertherm MG, the surface of the material formed by the perforated, coated glass fleece must also be described. The preparation must ensure support with protection against point loading. The required inspection point occurs before the stage described as covering with the synthetic membrane in the agreed installation. The basis for acceptance is the record of the MG designation and the condition of the fleece before covering, assigned to the drawing and the place of execution. Such a description limits discretionary decisions by the crew at a point that will not be visible later.

Delivery and acceptance documents

The delivery of IKO enertherm MG should be assignable to a single specification item. This item is expanded by an MG description covering the thickness, format and method of membrane installation; each described feature should have a reference to the project. A record of the MG designation and the condition of the fleece before covering is needed, allowing the variant and the manner of its use to be confirmed. If the conditions change, the set of requirements for the coated fleece and the waterproofing must be reconsidered. The update should be agreed by the roof designer working with the specific synthetic membrane before the next layer hides the discrepancy. In this way, the polyurethane insulation is linked to the executed scope, which is a flat roof under a synthetic membrane.

A record that can be checked later

The final description of IKO enertherm MG should make it possible to reproduce the adopted decision without guessing its purpose. In this case, the purpose can be defined as the need to select the thickness and a compatible method of connection with the membrane. The description should be accompanied by a roof cross-section with the confirmed method of membrane fixing. Separately, it is worth indicating the connection of the membrane to the surface of the boards in the fleece where its solution differs from the main field. The record should cover the entire required scope. When proposing a substitute, the compatibility of the covering layer with the coated fleece must be confirmed again, instead of basing the assessment solely on the name PIR. The polyurethane boards are then compared according to verifiable features and effects on the specific cross-section.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project