Specifying Utherm Roof LE in designs and quotation enquiries

PIR insulation

At a glance

The specification of Utherm Roof LE should lead to a single, clearly identifiable delivery variant. Lambda alone does not describe the format, the edges or the interaction with the roof covering. Linking the parameters to the drawing and to the method of fixing makes it easier to assess the conformity of the material later. Utherm Roof LE is a PIR board intended for flat roofs and roofs with a low pitch. The core is faced on both sides with a multi-layer, gas-tight laminate. The terms “polyurethane boards” and “polyurethane foam” are broader than the precise designation of the PIR product. When describing the application of PIR boards, the limited insulation height at the roof parapet with Utherm Roof LE must be stated unambiguously. The description of the function should allow the thickness of Roof LE, of the fall and of the other roof layers to be added together.

Utherm Roof LE – board and facing construction

PIR Roof LE boards where roof height is restricted

A short material item is not enough, because the gas-tight laminate does not define the height of the other roof covering layers. The functional criteria are intended to allow the low lambda to be used without shortening the required roof covering termination. In the documentation, include a dimensioned section at the lowest and highest point of the system and clearly indicate the place of application.

Lambda and the thermal resistance of a specific thickness

In the building design, Utherm Roof LE has a declared lambda of 0.022 W/(m·K), which at a small thickness gives a high thermal resistance. In the calculation part of the detailed design, however, two values must be separated: the resistance of the board itself and the U-value of the entire roof assembly. For the Utherm Roof LE 100 mm variant, a declared R_D of 4.50 m²K/W is given — this figure is entered in the layer schedule, not in the description of the whole building element. Such a format of recording allows a substitute to be checked later on the same assumptions, without transferring to it results relating to a different solution.

In the calculations, the resistance of the Roof LE board must be separated from the U-value of the entire roof assembly. The data must remain within their scope, since the fastenings and the connection to the parapet participate in heat flow outside the regular field. Verification of the solution should allow variants to be compared for the same thermal task and height limitation. Keep the catalogue thickness together with the result of the calculation of the entire building element, so that a later substitute can be checked according to the same assumptions.

Polyurethane insulation at openings and edges

In the detailed design, the substrate for the Roof LE boards is defined for a specific roof, and the arrangement of joints is planned so that successive rows do not form long, continuous gaps. The drawing should show the board layout in the area of the rooflight row and service penetrations, because that is where disruption of regular laying is most likely. Such a record links the choice of format to the roof geometry and allows the feasibility of the adopted laying method to be assessed at the specification stage.

The working drawing should help lay out the joints and cut-outs at the bases of elements penetrating the roof. It is not worth leaving this to the crew, since a large board will not automatically reduce waste on a surface with numerous openings. The adopted geometry must allow continuity of thermal insulation to be maintained without assembling the edges from random narrow strips. For acceptance of the polyurethane insulation, specify the laying plan with the selected format and marking of the joints at the openings. Also establish inspection before covering.

Roof LE laminate and compatible covering

The description of the solution in the specification should cover critical locations: outlets, skylights, parapets and service penetrations. The thickness of the Roof LE board there is linked to the height of the waterproofing upstand and to the shaping of the falls, so these parameters must be considered together, not as independent items. The analysis of the building envelope conditions also takes into account the contact of the Roof LE aluminium laminate with the intended roof covering — this is an element of coordinating the drawings with the material selection, not a standalone product parameter.

When selecting the fastenings, the compatibility of the adhesive or fixing with the Roof LE facing must be confirmed. The model and detail should take into account the fact that a similar appearance of silver facings does not prove equal adhesion of the materials. The set of materials must allow a system to be selected that retains the waterproofing and thermal insulation in accordance with the documentation. In the specification, explain the accessory set and the method of preparing the contact surfaces, while preserving the separate functions of the protective layers.

Compression and requirements for the entire roof covering

In the design and working documentation, the CS of Utherm Roof LE is at least 150 kPa at 10% deformation and must be recorded as separate information from the permanent loads from roof equipment. The bearing pressure of a device placed on a small foot does not follow directly from this value, so it must be described separately in the specification, indicating a system containing Roof LE with a CS of at least 150 kPa. Such a record allows the arrangement of supports to be linked with the board selection at the drawing coordination stage and prevents the compression declaration from being treated as the ready load-bearing capacity of the entire roof assembly.

When assessing conformity, the duration of the compressive load and the way the forces are distributed above the insulation must be checked. The scope of the documents must not be extended automatically, because the test point at 10% deformation is not an approval for any permanent compressive load. The design data should allow the support to be selected without converting a single figure into the load-bearing capacity of the entire roof. When approving the product, check the geometry of the support, the construction of the protective layers and the separate classification of the system for fire and conformity with the design.

Insulation with polyurethane: format, delivery and roof cost

The request for quotation and the specification should identify Utherm Roof LE by its full name, thickness, format and edge finish, because the lambda value alone does not indicate the delivery variant. The catalogue lists, among others, the formats 1200 × 600 mm and 2400 × 1200 mm, and the difference between them is logistical in nature and affects the way deliveries are made and how cutting is carried out. When coordinating with the construction drawings, it is worth linking the choice of format to the arrangement of joints and cut pieces, so that the assessment of material equivalence refers to the same product and the same system geometry.

In the material procedure, it is worth matching the size of the Roof LE board to access and the planned cutting. A single matching characteristic does not conclude the analysis, because the largest format may require additional space for handling and cutting. The material procedure should make it possible to reduce the number of operations while maintaining correct joints and terminations. In the delivery agreement, state the quantity survey of full boards, cut pieces and materials needed at the roof perimeter, so that the decision remains reproducible after installation.

A case worth considering

In the Roof LE specification, recording the lambda value of 0.022 does not yet identify the edge and the format. The design should indicate the required finish and the method of fixing. If an alternative format has been permitted, it is worth checking the effect on the joint arrangement. CS should also be distinguished from long-term loads from equipment. Such a specification makes it easier to assess a substitute without transferring to it assumptions relating to a different system.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project