EFIGREEN ALU+ and ALU+ XL: data for comparing variants

PIR insulation

At a glance

With ALU+, the specifier should distinguish between the basic format and the XL variant. Thermal data must be assigned to the selected thickness. The fire requirement must not be supplemented with a default class instead of NPD. If it is required by design, the correct basis of assessment for the specific solution must be obtained. The EFIGREEN ALU+ specification should identify the function that the thermal insulation of a roof slope intersected by numerous service penetrations is to fulfil. One element requiring an unambiguous description is the narrow field between two service bases. The input data must include the strip width and the lengths available for laying full sheets, not only the area intended for thermal insulation. The cutting plan for the specific ALU+ or XL format remains the coordinating document.

Board with a pale core and ochre face, illustration in the EFIGREEN ALU+ and XL specification guide

Input data for the specification

It must be recorded who confirms that the task can be carried out: combining the relevant thermal parameter with a sensible board cutting plan. In this respect, the person responsible should be the specialist preparing the cutting plan and the delivery schedule, in accordance with the division of design work.

The product concerned and the scope of its data

EFIGREEN ALU+ is regarded as a board with a PIR core enclosed in a composite kraft–aluminium–PE facing, whereby the properties are attributed to the entire product and not to the core alone. For the 30–35 mm range the declared lambda is 0.023 W/(m·K), and for 40–160 mm it is 0.022 W/(m·K); the choice of thickness must therefore indicate the correct value. The datasheet states CS(10/Y)200, and the Polish product page designates the reaction to fire as NPD, i.e. no declaration – in the description it must not be replaced with a default class. The basic format is 600 × 600 mm, whereas ALU+ XL has different dimensions depending on the variant, which links the selection to the cutting plan. In this article we consider a roof slope divided by numerous service penetrations; in the specification this means the installation of factory-made boards in a defined layer arrangement, and not the selection of a loose-fill material.

What the presented calculation covers

When preparing the cutting plan for EFIGREEN ALU+ or XL, mark on the drawing the format of each batch and the cut pieces at penetrations. A thickness of 100 mm and a lambda of 0.022 W/(m·K) give, in a simple calculation, 0.10/λ of approximately 4.55 m²K/W. Do not designate this result as the declared RD: this value must be read from the product documentation. The offer must state the full variant, thickness and format so that it can be compared with the drawing.

For EFIGREEN ALU+ a distinction must be maintained between the product data and the result of the overall solution. The analysis uses the characteristic: the dependence of lambda on the selected thickness. The assessment must take into account the limitation: the share of short cut pieces around obstacles. Before approving the variant, the sheet consumption must be recalculated after the openings have been laid out and the result recorded in the documentation. Reproducing the assumptions is made possible by the cutting plan drawing for the specific ALU+ or XL format. This ensures that a later comparison with another offer does not omit the element described as the narrow field between two installation bases.

Conditions for variant assessment

In the project, the performance described as laying the basic 600 × 600 mm format can be compared with the solution that is the use of a suitably selected XL variant. The criterion should follow from the need to combine the correct thermal parameter with a sensible cutting layout of the boards. For EFIGREEN ALU+, keeping a single figure from the datasheet does not mean that the entire build-up is equivalent. The requirements must also take into account the simple edge requiring cut pieces to be fitted precisely. Assigning to the thin variant a lambda intended for the thicker board must be excluded, because this changes the meaning of the recorded parameter. The decision should be presented by the specialist preparing the cutting layout and the delivery schedule, together with the scope of changes for adjacent materials. The adopted variant must be linked to the schedule: the measurement for the selected format with waste shown separately.

Description of the execution of the relevant joint

The drawing should clearly indicate the narrow area between two service bases. In the case of EFIGREEN ALU+, the surface of the material formed by the composite of kraft paper, aluminium and PE film should also be described. The preparation must provide a stable substrate for the small pieces around the penetrations. The required point of inspection occurs before the stage described as the agreed covering with the intended method of fixing. The basis for acceptance is the record of the full name of the variant, the thickness and the delivery format, assigned to the drawing and the place of execution. Such a description limits discretionary decisions by the crew at a point that will not be visible later.

Delivery and acceptance documents

The delivery of EFIGREEN ALU+ should be assignable to a single specification item. This item is expanded by the measurement for the selected format with waste shown separately; every described feature should have a reference to the project. A record of the full name of the variant, the thickness and the delivery format is needed, allowing the variant and the way it is used to be confirmed. If conditions change, the share of short cut pieces around obstacles must be reconsidered. The update should be agreed by the specialist preparing the cutting layout and the delivery schedule before the next layer hides the discrepancy. In this way the polyurethane insulation is linked to the executed scope, which is the thermal insulation of the roof slope divided by numerous service penetrations.

A record that can be verified later

The final description of EFIGREEN ALU+ should allow the adopted decision to be reproduced without guessing its purpose. In this case the purpose can be defined as the need to combine the correct thermal parameter with a sensible cutting layout of the boards. The description should be accompanied by the cutting layout drawing for the specific ALU+ or XL format. The narrow area between two service bases should be indicated separately where its solution differs from the main area. The record should cover the entire required scope. When proposing a substitute, the consumption of sheets must be recalculated after the arrangement of the openings, instead of basing the assessment solely on the name PIR. Polyurethane boards are then compared according to verifiable features and the effects on the specific build-up.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project