Distinguishing heat loss through the building envelope from ventilation losses

EPS and insulation

At a glance

EPS reduces heat transfer through the building envelope, but it does not replace proper air exchange. Heat losses through walls and the roof are calculated differently from the heat required to warm the air entering the building. Their share depends on the building and on how it is used. Separating these components helps determine the right scope of thermal modernisation. The first path runs through the building envelope: walls, roof, windows, doors and floor. Heat passes through the materials and through the joints between components. The second path is linked to air exchange. Warm air leaves the building, and the incoming air must be heated. Insulation with EPS mainly affects the first group. It does not eliminate the need to supply fresh air.

White EPS next to a ventilation grille, with tape measure and pencil on the surface

Two paths through which a building loses heat

Exchange can take place through designed ventilation and through leaks. These phenomena must be distinguished. Tight connections limit incidental flow, but the required ventilation flow rate must still be provided. Openings and gaps should not be treated as a convenient way of ventilating an insulated house. Their effect depends on wind, temperature and incidental geometry.

How is the flow through a wall area calculated?

In a simple steady state, the thermal power is U × A × ΔT. U is the U-value of the building component, A its area, and ΔT the temperature difference. For an example of 100 m² of wall with U = 0.20 and a difference of 20 K, we obtain 400 W. The result applies only to that area under the specified conditions. Additional junctions and the relevant corrections must be included in accordance with the method.

Increasing the thermal resistance of the EPS reduces the wall’s U-value. However, it does not automatically change the U-value of the windows or the air flow in the ventilation duct. Therefore, the improvement of the wall cannot be multiplied across the entire heating bill. The other components must be calculated first. Floors on the ground and building components adjacent to unheated spaces also require calculation rules specific to them.

How can the heat associated with air be estimated?

For a simple example without heat recovery, the approximation P = 0.34 × air flow rate × ΔT can be used. The flow rate is given in m³/h, and the result is obtained in watts. The coefficient 0.34 results from the approximate volumetric heat capacity of air and the conversion of time. This simplification serves to show the scale, not for the complete sizing of a system.

With an assumed flow rate of 150 m³/h and a difference of 20 K, we obtain approximately 1020 W. This is not a recommended flow rate for a specific house. The required air exchange depends on the rooms and their use. The example merely shows that air can have a significant share in the balance. However, the required ventilation must not be restricted merely to reduce the figure in such a calculation.

What does heat recovery change?

Ventilation with heat recovery can reduce the heat needed to prepare the supply air. The actual effect depends on the efficiency of the unit, the flow rates, the controls and the operating conditions. It is not equal to a simple percentage of the whole bill. The energy used by the fans and the way the system operates under varying conditions must also be taken into account. Manufacturer’s data require proper interpretation.

Leakage in the building envelope can cause a flow that bypasses the heat recovery. The ventilation system and the airtightness of the building should therefore be coordinated. At the same time, a greater EPS thickness does not repair a leaky junction between the window and the wall. In a renovation it is worth establishing which layer is responsible for airtightness and how it will be connected at all openings and penetrations.

Why are the percentage shares not constant?

In an old building with uninsulated walls, their share can be large. After thermal insulation, the remaining losses through air make up a larger percentage of a smaller total. This does not automatically mean that ventilation alone has started to lose more heat. The denominator has changed. The same caution must be exercised when comparing percentages before and after replacing windows.

A seasonal balance takes into account changes in weather, indoor temperature and use. Solar and internal gains are added. A simple power calculation for a frosty day is not annual energy consumption. Likewise, an airtightness measurement at an imposed pressure difference does not directly give the everyday air exchange rate. The results of different tests must be used in accordance with their purpose.

How should the order of works be chosen?

It is worth preparing a balance of the building envelope and air exchange, and then comparing modernisation options. Additional thermal insulation, sealing and improved ventilation can complement one another. When replacing windows, the designed air supply must be maintained. When insulating the roof, penetrations for services must be taken into account. This ensures that one improvement does not create a new problem with moisture or indoor conditions.

Polystyrene is produced by companies including Termo Organika, Arsanit, Genderka and Paneltech. The choice of their boards should match the specific building components and calculations. EPS is an effective component of thermal insulation when it works in a correct system. The full effect of a modernisation also depends on joints and installations, which is why a house should be assessed more broadly than by insulation thickness alone.

7 branches. Materials closer to your project.

Izoprofil.eu map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project