NEXLER BITFLEX Primer, quick-drying bituminous primer, 22 kg for building protection

54,22 € incl. VAT

Out of stock

Anionic bituminous primer
Nexler BITFLEX Primer 22 kg
Quick-drying anionic bituminous primer
Consumption:
Priming: approx. 0.2 kg/m²
Damp-proof coating: approx. 0.5 kg/m²
Drying time: ≤ 2 h
Water dilutability of the compound: > 300%
Application temperature: +5°C to +30°C
Applications:
Priming substrates beneath bituminous compounds, torch-on and self-adhesive bitumen membranes;
Priming substrates with reduced water absorption, including so-called waterproof concrete;
Priming ground-bearing floors in basements and garages;
Priming OSB boards;
Protecting timber elements embedded in the ground;
Damp proofing of below-ground building and structural elements.
Price unit: pack
Pack / price coverage: 22 kg pack
Sales unit: pack

Out of stock

SKU: izoprofil-eu-9121 Category:

Description

Free quote — +48 500 409 109

Waterproofing

Plan water protection before backfilling foundations or installing the next balcony layers. These areas will be much harder to reach later. Waterproofing creates a continuous protective layer under the conditions specified for the product. At SteelProfil, you can choose materials to suit the substrate, application location and sequence of work.

PROTECTING WALLS AND CONNECTIONS

Waterproofing compounds coat surfaces and follow their shape. This is useful on foundation walls, footing connections and details near ground level. A suitably selected product can provide damp proofing or waterproofing. The scope of use follows the ground conditions and the documentation for the specific system.

Available technologies include flexible polymer-modified bituminous compounds. Selected products can be applied to different substrates to form a continuous coating. On site, this allows corners and joints to be treated carefully. We match the material to the task so that application and adjoining layers form a compatible build-up.

PROTECTION BENEATH THE FINISH

Waterproofing is often hidden after completion, but it remains important to the building’s use. It protects foundation areas and, in suitable systems, balconies and other building elements. When selecting a product, consider what will sit above and beside it. Compatibility with insulation and protective layers helps create a durable connection.

Changes of plane and service penetrations need particular attention. Preparing these details in advance helps maintain coating continuity. They need not complicate the work when the entire set of materials is selected before application begins. This benefits both installer and client, allowing subsequent stages to proceed in the planned order.

Also plan how the finished waterproofing will be protected during later work. At foundations, this is part of preparing for backfilling; on a balcony, it forms part of the next layer build-up. Coordinated work makes the most of the material’s properties. You are buying more than a bucket of compound: you are choosing protection suited to the whole stage of construction.

ALL MATERIALS READY BEFORE WORK STARTS

SteelProfil’s promotions and competitive prices help you assemble waterproofing and the supporting materials it needs. Selected building products are available from stock, and our board and insulation ranges include first and second grade. Chemical waterproofing products are selected according to their intended use and documentation. This combines economical purchasing with a suitable technical solution.

Tell us the substrate type, area and location of the waterproofing work. We will check the suitable product and the quantity required for its intended use. If foundation insulation or balcony preparation is being carried out at the same time, we will also consider those layers. The materials will match actual site conditions, including consumption for the required layer thickness and details.

See the SteelProfil selection: Waterproofing

What our customers say

Back to top